|

Corporate Offices
4501 US Hwy. 12
Richmond, IL 60071
Phone: (815) 675-0555
Fax: (815) 675-1033
Rockford Region
1311 McKinley Ave
Belvidere, IL 61008
Phone: (815) 544-3232
Fax: (815) 544-3240
O'Hare Region
33W800 Gilbert St
South Elgin, IL 60177
Phone: (847) 742-9328
Fax: (847) 742-9371
Byron Plant
3499 Tower Rd
Byron, IL 61010
Phone: 815-234-2225
Fax: 815-234-7725
Check Weather
|
 |
 |
 |
 |
Pavement Maintenance:
Pavement Markings
Pavement
Markings |
Speed
Bumps & Parking Bumpers
Sealcoating
|
Infrared
Patching |
Hot
Pour Crack-Sealing
-
Parking lot striping is one of the simplest yet
important services Rabine Paving provides. Clearly marked stalls,
handicap spaces, and directional arrows are a critical element in
maximizing parking lot space and smoothing the flow of lot traffic.
Ensuring that the striping is compliant with the Americans with
Disabilities Act also lowers owner liability.
-
At Rabine Paving we begin by making sure that the surface on which the markings
will be placed is free of moisture, dust and debris. The presence of any of
these will cause the paint to lose its adhesive properties prematurely and
flake. The paint is then applied with particular attention paid to both the
thickness of the paint and the width of the stripe so that precise and uniform
lines result. Rabine Paving utilizes airless striping equipment, providing crisp,
clean edges on our lines and reducing waste and pollution from overspray.
-
Crack sealer is an elastic material designed to seal joints and cracks against
this moisture infiltration into the subgrade. Subgrade moisture is one of
the leading causes of pavement failure, so it is essential that asphalt cracking
is attended to promptly in order to extend the life of the pavement and save
money long-term. Typically, we recommend filling cracks and joints 1/4 inch
or wide or greater.
-
Rabine Paving uses both an oil-based paint
application and a water-based paint depending on the season.
The water-based paint dries relatively quickly, usually within
5 to 10 minutes of application, while the oil-based paint takes
around 15 to 20 minutes to dry. We can also add glass beads
for reflective purposes if necessary.
|
 |
 |
 |
 |
Home
| Mission
| Our Team | Map |
Paving | Maintenance
Street Print | Concrete | Snow&Ice
| Our Clients
Testimonials |FAQ | Affiliates
| Contact |
|
|